Maintenance Log
Posted on Tue Sep 30th, 2025 @ 12:46am by Chief Petty Officer Aaron Geiger
151 words; about a 1 minute read
Chief Petty Officer Aaron Geiger
Maintenance Log:
Ablative Shield Power Generators: Restored to 100%
Monthly, Quarterly, and Annual PM completed
Fire Suppression System: Replicated larger foam storage tank and successfully installed throughout Main Engineering work areas.
Deflector Dish: Aligned to TM Specifications, Attenuation optimized, and Annual PM completed.
Display replacements: Bridge Science console, Hairline crack in Captain's Ready Room wall panel, Engineering Status Boards 1, 4, & 9.
Phaser Bank: Monthly, Quarterly, Annual PM completed on all phaser arrays
Comm Console: Replaced Crypto Module - New Crypto Keys loaded see chain of custody log for Crypto details
Shuttlecraft: Reports of scraping noise when lowering ramp. Unable to replicate, relubricated piston and tightened to TM spec. Will reinvestigate if reports continue
Bulkhead section in Mess Hall reported damaged following Morale Wellness and Recreation event. New panel replicated and installed. Damaged materials recycled.
Turbolift 3 reported slowness. Applied sensor to Turbolift 1 & 3, will compare data in two days.
END LOG